Groundworks and civil works
Excavation pit, spoil, trenches, backfill and everything below finished ground level.
Master craftsman firm for shell construction
We build the load bearing shell of your house, layer by layer: excavation, foundations, floor slab, walls, floors, stairs and a clean connection to the roof. One firm for everything that cannot be changed afterwards.
Call02165 171 666
Subsoil
Bedburg sits in the Erft valley, and the ground changes from plot to plot. What lies a metre down is told to you by the soil survey, not by the house next door. We read it before the first cubic metre is moved, and set the excavation, the foundation type and the backfill accordingly.
Excavation pit, foundations and floor slab come from the same hands as the walls above them. Anyone who separates groundworks from shell construction ends up negotiating over every centimetre that one trade pushes onto the other.
A shell begins below zero, not at the floor slab.

Section
Six layers stand between undisturbed ground and the roof connection. Choose a layer to see what is built there and where it can go wrong.
Formation level and blinding
The pit is levelled and the formation is checked. A thin blinding layer goes on top so that reinforcement and formwork stand on an even, load bearing surface instead of on loose spoil.
Foundations and floor slab
Strip footings or a continuous slab, depending on the chosen foundation. Reinforcement to drawing, cover secured with spacers, and the starter bars for the walls above are already set here.
Basement walls and tanking
Walls in concrete or masonry, with the penetrations and recesses the building services will need later. The junction with the waterproofing is planned before anything is formed, not chased in afterwards.
Floor slab and downstand beams
Slab formwork, beams and props are erected and kept propped until the floor carries itself. Downstand beams and bearings are poured together with the floor so that no cold joint appears.
Rising masonry
External and internal walls are built up, lintels set, openings left out to drawing. This is where it is decided whether windows and doors will fit later without anyone reworking them.
Ring beam and roof connection
The ring beam closes off the rising masonry and takes the loads of the roof. After that the shell is ready to hand over and the carpenter can set the roof structure.
Not every shell has a basement. Without one the third layer falls away and the floor slab carries the ground floor directly.
Discuss your stageExecution
Complete or as a single trade. If a developer keeps the shell in house and lets only the formwork, that is an ordinary job for us.
Excavation pit, spoil, trenches, backfill and everything below finished ground level.
Panel, slab and purpose made formwork. Erected, aligned, tied and secured against the pressure of fresh concrete.
Mesh, bar and prefabricated cages to the reinforcement drawing, with laps and splice lengths as specified.
Foundations, floor slabs, walls, columns, downstand beams and floors. Placed, compacted, levelled and cured.
Basement masonry, external and internal walls, lintels and junctions with the existing structure.
Solid flights and landings, formed, reinforced and cast together with the element they connect to.
Extensions, garages, openings, new walls and repairs in existing buildings, agreed with the structural engineer.
Our own lifting and haulage equipment, so the rhythm on site does not depend on somebody else’s calendar.
Enquiry
One sentence about the project, where the site is, and a number we can reach you on. Everything else we settle in conversation.
Before you write
Received
Your enquiry has reached us. We will come back to you on the number you gave.
Process
Five steps, each of which makes clear who delivers what, and how the next trade knows it can start.
You describe the project, we look at the plot. After that both sides know whether it fits.
We work through the construction and reinforcement drawings and price the scope you actually want to let.
Access, storage areas, crane and material calls are agreed before the first vehicle arrives.
Layer by layer to the programme. Anything that slips we say as soon as we can see it, not on the day itself.
A walk round together, dimensions checked, open points noted and worked off. Then the next trade takes over.
You reach us on the same number for the whole of the build.
Sites
Groundworks, concrete, masonry and the connection to the roof, photographed on KNOP Bauunternehmen sites. Tap an image to see it large.
All photographs come from the picture archive of KNOP Bauunternehmen.
Before the pour
Concrete forgives nothing that was overlooked beforehand. We go through these four points before every pour, because afterwards they are only expensive to correct.

Area covered
Bedburg is the reference point of this page. We travel across the Rhein-Erft district and into the neighbouring municipalities whenever the journey suits the project.
Regularly on site in
Your town is not on the list? Ask anyway. What decides it is the project, not the postcode.
Questions
At the roof connection. The shell covers the foundation, the floor slab, load bearing and space forming walls, columns, downstand beams, floors, stairs and the ring beam. Roof covering, windows, building services, plaster and screed are not part of it.
Yes. Groundworks, formwork, reinforcement, concrete and masonry are let individually as well. With developers that is the normal case, when the rest of the shell stays in house.
Yes. The registered office is Monheim am Rhein and the work goes well beyond it. Bedburg and the Rhein-Erft district are within the usual area we cover.
Not for the enquiry. For a reliable quote and for the foundation design, yes, because otherwise nothing can be said about what the building sits on. If you do not have one, we will tell you in the first conversation what to commission.
When the concrete has reached the strength needed for it. That depends on the element, on the concrete class, on the temperature and on the curing, and it is decided on site.
Call, or write a short note about what it is. Useful details are the project, the place, the planned period and the drawings, if they already exist.
Tell us what is to be built on the plot. We will look at the documents and come back with what you need in order to decide.
Anyone building in Bedburg settles everything that follows when they build the shell. Wall thicknesses, openings, floor heights and junctions are created once and can only be corrected later at real cost. KNOP Bauunternehmen builds complete structural shells in Bedburg from the excavation pit to the ring beam, and takes on groundworks, formwork, reinforcement, concrete and masonry as one package.
The firm was founded in 2008 by Viktor Knop, master bricklayer and concrete constructor, and he leads it to this day. We build for private clients, for developers and for architects, on new sites as well as in existing buildings: extensions, garages, openings, new walls and refurbishment belong to the programme just as much as a complete new build. Detached houses, apartment buildings, office buildings and industrial buildings have passed through our hands.
Beyond Bedburg we work across the Rhein-Erft district and the neighbouring municipalities, among them Bergheim, Elsdorf, Grevenbroich, Rommerskirchen and Kerpen. For a first quote the project, the place and the drawings, if they exist, are enough.
This site sets a single, strictly necessary cookie called site_lang. It stores only your language code, lasts a year and takes you on the start page into the language you last chose. No analytics, no advertising, no sharing.
Knop Bauunternehmen GmbH
Frohnstr. 43
40789 Monheim am Rhein
Viktor Knop, master bricklayer and concrete constructor
Phone: 02165 171 666
Email: viktor@knop-bauunternehmen.de
Register number: HRB 87141
Registering court: Amtsgericht Düsseldorf
Professional title: bricklayer and concrete constructor, awarded in the Federal Republic of Germany. Responsible chamber: Handwerkskammer Düsseldorf.
Viktor Knop, address as above.
The European Commission provides a platform for online dispute resolution: ec.europa.eu/consumers/odr. We are neither obliged nor willing to take part in dispute resolution proceedings before a consumer arbitration body.
Knop Bauunternehmen GmbH, Frohnstr. 43, 40789 Monheim am Rhein. Phone 02165 171 666, email viktor@knop-bauunternehmen.de.
This site works without tracking, without audience measurement and without advertising networks. We process personal data only as far as that is necessary to operate the site and to answer your enquiry, on the basis of Art. 6(1)(b) and (f) GDPR.
When the page is requested, the server processes the details technically required for it: the network address of the device, the time, the file requested and the browser identification. They serve delivery and security and are not combined with other sources.
We process the details entered in the form in order to handle the enquiry and to ask about it. The legal basis is Art. 6(1)(b) GDPR for steps prior to a contract, otherwise Art. 6(1)(f) GDPR. We delete the details as soon as they are no longer needed for that purpose and no statutory retention period stands against it.
The form transmits your details in encrypted form to the central application at https://olumax.com, through which this company manages its enquiries. The provider processes them as a processor under Art. 28 GDPR solely on our instructions and does not pass them on to third parties.
A single, strictly necessary cookie named site_lang is set. It stores the code of the chosen language, lasts one year and serves the language choice alone, under § 25(2)(2) TDDDG. On the start page a stored en, pl or ru takes you once to the page in that language; with de, with an unknown value and with no cookie you stay on the German page. The language pages themselves never forward. Your acknowledgement of the cookie notice sits in your browser’s local storage and is not transmitted to us.
You may request access, rectification, erasure, restriction of processing, data portability and object to processing, Art. 15 to 21 GDPR. You also have the right to lodge a complaint with a supervisory authority, in North Rhine Westphalia with the State Commissioner for Data Protection and Freedom of Information.
The site is delivered encrypted over HTTPS. Technical and organisational measures protect the details against loss and unauthorised access.
Purpose: remembers the chosen language, so that the switcher shows the right language as current and the start page takes you into that language.
Content: only one of the codes de, en, pl or ru.
Lifetime: one year. Scope: this address. Transfer to third parties: none.
Legal basis: § 25(2)(2) TDDDG, strictly necessary for a service you expressly requested.
On the start page the cookie decides: if it holds en, pl or ru, the start page takes you once to the page in that language. If it holds de, an unknown value or nothing at all, you stay on the German start page. The language pages themselves never forward.
This site sets no further cookies. Your acknowledgement of the cookie notice is kept in your browser’s local storage and is not sent to us.
This site is built to WCAG 2.1 level AA: semantic structure, full keyboard operation, visible focus indicators, sufficient contrast, alternative text for every image and reduced motion when your system asks for it.
If you run into a barrier, write to viktor@knop-bauunternehmen.de. We will put it right.